Microsoft Heidelberg Campus

Planned
MicrosoftHeidelberg, MississippiTier 3Built 2024

About This Facility

Announced Microsoft Mississippi data center campus.

Facility

Power Capacity
150 MW
Square Footage
1.1M sq ft
Est. Employees
1,300
Tier
Tier 3
Year Built
2024
Status
Planned

Laurel, MS Market Overview

Laurel sits in southeast Mississippi, with an economy built around oil and gas distribution (the strategic petroleum reserve is nearby), manufacturing legacy (lumber, oil, and shipbuilding), and now a growing data center presence. The broader economy is small-town Mississippi commercial activity layered onto specialized industrial and energy work.

BLS does not publish MSA-level wage data for Laurel, but the regional Mississippi pattern shows trades wages compressed relative to national averages, with electrician and HVAC work paying below the national median but well above local non-skilled work. The data center campus represents a meaningful step up in available trades opportunities for the region.

For a trades worker, Laurel is a small low-wage Mississippi market where the data center facility represents a notable upgrade in available skilled-trades work. Best fit for HVAC technicians and electricians willing to accept the regional pay floor in exchange for very low housing costs. Limited overall data center opportunity but a real anchor employer.

AI-generated summary

Jobs Near Microsoft Heidelberg Campus

Live searches on the major job boards for Heidelberg, MS.

DataCenterJobs is not the employer and does not guarantee listing availability.

Community

💬

Coming Soon

Facility-specific discussion threads for workers and job seekers. Join the waitlist.